玖玖成人,国产精品成人爰爱在线,国产大陆一区二区三区,亚洲精品综合欧美二区变态,伊人伊成久久人综合网,1024欧美一区二区日韩人妻,99国产欧美久久久精品密桃,92久久偷偷做嫩草影院免费看

sales@gninstruments.com

Location -> News

News

Straight pipe sections before and after installation of Coriolis mass flow meter

When the Coriolis flow meter measures liquids, the installation of the mass flow meter has no special requirements for the front and rear straight pipe sections, but the following conditions must be met:

 
(1) For liquid media, keep the flow meter at the low point of the pipeline. Avoid vaporization of the medium due to low back pressure, which will affect the measurement results.
For gaseous media, the flowmeter cannot be placed at a local low point in the pipeline to avoid liquid accumulation in the measuring tube and measurement errors. To
 
(2) For liquid media, the pipeline must be filled with the media during operation. Do not allow gas-liquid or liquid-solid two-phase fluid to exist in the measuring tube.
If it is installed on a vertical pipe, the fluid should flow from bottom to top. If it is necessary to flow from top to bottom, a restrictive orifice can be installed behind the flow meter to prevent the measuring tube from being evacuated.

 
(3) The flowmeter and the connecting flange must be completely aligned, otherwise it will bring external stress to the measuring tube and affect the measurement result.
 
(4) To avoid interference from strong electromagnetic fields to the flowmeter, there should be no interference sources such as large motors near the flowmeter.
 
(5) When mass flowmeters of the same model are installed next to each other, consider staggering the vibration frequency to avoid the negative effects of resonance,
and the distance between the two flowmeters is at least 4 times the length of the meter.
 
(6) Pay attention to the natural vibration frequency of the flowmeter phase measurement and the natural vibration frequency of the pipeline, otherwise it will cause measurement fluctuations.
 
(7) Stop valves should be installed before and after the flowmeter to facilitate zero point calibration before operation.

 
(8) When Coriolis is testing gas and steam, there are still requirements for straight pipe sections in order to ensure the accuracy of measurement. 
 

If you want to know more detailed parameters and quotations of Coriolis flowmeters, please contact winny: sales01@cxflowmeter.com

 

Last:Installation of external clamp .. Next:Common problems of steam vortex..

Contact Us

Office Address: Room 402, No. 650, Xinzhuan Rd., Jiuting Town, Songjiang District, Shanghai, China (Mainland)

Phone:021-57635022

E-mail:info@gnflowmeter.com

E-mail:sales@gninstruments.com

關(guān)閉
主站蜘蛛池模板: 奉节县| 镇康县| 寿宁县| 佛教| 仲巴县| 栾城县| 岐山县| 南郑县| 友谊县| 金山区| 荆州市| 罗江县| 大城县| 凌云县| 横峰县| 白山市| 蚌埠市| 图木舒克市| 彭阳县| 湖南省| 长泰县| 军事| 常山县| 新干县| 若尔盖县| 双峰县| 行唐县| 来宾市| 汝阳县| 思茅市| 宁乡县| 孝感市| 永登县| 东兰县| 崇文区| 富裕县| 桐城市| 科技| 怀集县| 梨树县| 永定县|